McFauld's Lake Project
Jeremy Niemi, Vice President, Geology for Noront Resources is the qualified person who prepared or supervised the preparation of the scientific and technical information disclosed herein.
Blackbird One
Visual Drill Results
| Hole ID | Northing Local (m) |
Easting Local (m) |
Northing UTM (m) |
Easting Local (m) |
Azimuth (Deg.) |
Dip (Deg.) |
Length (m) |
Mineralization (m) |
|---|---|---|---|---|---|---|---|---|
| NOT-08-1G42 | 850 | 3410 | 5842062 | 546000 | 0 | -90 | 459.7 | No chromite observed |
| NOT-08-1G43 | 875 | 3160 | 5842100 | 546050 | 0 | -90 | 630 | 444.2 - 481.3 (chromite beds) 482.4 - 496.3(massive chromite) |
| NOT-08-1G45 | 920 | 3050 | 5842062 | 545900 | 0 | -90 | 357 | Lost hole |
| NOT-08-1G47 | 827 | 3300 | 5842137 | 546150 | 0 | -90 | 669 | 549.1 - 554.9 (chromite beds) |
| NOT-08-1G48 | 867 | 3225 | 5842137 | 546959 | 0 | -90 | 15 | Abandoned |
| NOT-08-1G49 | 867 | 3225 | 5842137 | 546050 | 0 | -90 | 248 | No significant mineralization |
| NOT-08-1G51 | 947 | 3085 | 5842100 | 545900 | 0 | -90 | 645 | No chromite observed |
| NOT-08-1G52 | 867 | 3225 | 5842137 | 546050 | 0 | -90 | 708 | 578.5 - 579.5 (chromite bed) |