Windfall Lake Project, Quebec Canada

Chibougamau Mining District at Windfall Lake
Windfall Lake Project Profile
Location:
Chibougamau Mining District in Urban Township (Abitibi Region), Quebec

Minerals:
Gold

Summary:
This project currently covers two adjacent claim blocks (1,440 hectares) of which Noront holds a 100% interest.

Advanced drilling (over 200 holes to date) has outlined a number of high grade gold zones at various depths including 4.8 meters of 52.3 ounces per ton of gold.

The Company and its engineers have designed and permitted an exploration ramp (4.5 meter diameter) to bulk sample some of these zones. The ramp will greatly enhance the geological understanding of the mineralized system and allow the Company to formalize a resource estimate.

The exploration ramp and construction is currently underway as of January 2008.

Significant visible gold has been observed as the ramp proceeds to additional zones with exceptional samples at Zone 17. See Windfall Lake's Exploration Ramp Progress (in PDF) and sample image below right under Mineral Previews.
Latest Press
Jun. 27, 2008

Jun. 24, 2008

Mar. 18, 2008

See All Releases
 
More Info
June 26, 2008 (PDF):
Windfall Lake's Exploration Ramp Progress
Nov. 2007 (PDF):
Site Improvements
Aug. 2007 (video):
Windfall Lake Presentation
Jun. 2007 (PDF):
Windfall Lake Geological Report
Windfall Lake Mineral Previews

Rhyolitic volcanic centre


Core sample

Visible gold, zone 17, encountered in ramp (Jun 08)
   
Latest Windfall Lake Pictures

Looking down newly completed ramp (Apr 08).

Reverse shot at ramp entrance (Apr 08).
   

Starting before the sun rises (Apr 08)

Core shack and storage area (Jan 08).
   

Engineering offices (Jan 08).

Noront camp one, two and the infirmary (Jan 08).
   

Drilling blast holes (Jan 08).

Loading holes in ramp portal slot (Jan 08).
   

Preshear blasting area (Jan 08).

Removing and preserving soil on Day 1 of underground programme (Oct 07).